Home > Property Developers and Owners > Highways and byways
Case Study

Brief

Road

A retail redevelopment in Bolton town centre required the permanent closure of two strips of road: one of 10m and one of 30m. Fierce local objection was raised to the extinguishment of a public right of way.

Role of Richard Max

Acting both as solicitor and advocate at the subsequent Public Inquiry

Overseeing negotiations with local groups

Outcome

Inspector concluded that highways should be stopped up

 
Personal tools